![]() The aerial view of Harrah’s New Orleans Casino and the hotel construction gives a whole new perspective to this downtown landmark. In this video, you can see several of Eustis Engineering’s project sites at different stages of construction. This new 800,000 square foot casino design included 4 levels gaming, restaurants, ballroom, back of house support, parking. If you dont see 10 floors then you entered the wrong garage. 8-110v outlets in wooden covered box on 10th floor. The additions include a hotel tower, which requires installation of new pile foundations beneath the existing basement accessed at street level through the existing structure. Eustis Engineering performed the geotechnical explorations for the hotel project is the geotechnical engineer of record for the hotel foundation design and is performing construction materials testing, inspection, special inspection, and engineering during construction services for this project. 120 Volt plugs are located near the stairwells. Eustis Engineering would like to highlight our involvement with the hotel addition to Harrah’s New Orleans Casino, now owned by Caesars Entertainment.Įustis Engineering has completed multiple projects at this site in the past, including the geotechnical exploration for the Rivergate Convention Center, which originally included a tunnel designed to usher six lanes of high-speed interstate traffic to downtown New Orleans. The project was never completed as designed, so the tunnel was repurposed into underground parking beneath what is now Harrah's Casino on Poydras Street. ![]()
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |